Fe
Volume VPelletizing Plant Conceptual Plan & Value-Added Metallurgy

21. Binder Systems, Fluxing, Thermal Balances & Material Handling

Pages 357–374 · 18 pages in this chapter374 / 530
Sources

Scope & Subject Matter

  • Binder selection and dosing systems:
  • Sodium bentonite vs. organic binders (dosing rates 0.6% to 1.2% by weight) to achieve cold compressive strength (CCS ≥ 2,500 N/pellet).
  • Fluxing additives:
  • Ground limestone (CaCO3) and dolomite (CaMg(CO3)2) addition to control pellet basicity (CaO/SiO2) and improve high-temperature softening-melting behavior in blast furnaces.
  • Thermal energy balances and burner configuration:
  • Multi-fuel burner options (heavy fuel oil, pulverized coal, or liquefied natural gas / biomass blends).
  • Specific heat consumption targets (sim 300 ext{--}350 ext{ Mcal/metric ton} of pellet).
  • Material handling and storage:
  • Finished product screening, load-out silos, and degradation prevention during stockpile storage.
Technical specification

Pellet plant

Capacity
1,000 TPD blast-furnace pellets
Process
Traveling grate / rotary kiln
Induration
1,250–1,320 °C
Additives
Bentonite binder, limestone flux
CCS
≥ 2,500 N/pellet
Split
70% concentrate export / 30% pelletized
Technical specification

Upgrading plant

Capacity
1,000 TPD finished concentrate
Feed
~5,600 TPD
Classification
Spiral separators
Regrind
Ball mill, P80 45–75 µm
Cleaning
3-stage LIMS to ≥62–65% Fe
TiO₂
≤ 4.5%
Water
Zero-effluent closed loop
CAPEX
US$50–55M (Class 5)