Scope & Subject Matter
- Capital expenditure benchmarking across construction alternatives:
- Newbuild construction vs. existing hull conversion (Capesize/Handymax bulk carrier retrofits).
- Shipyard evaluation and selection matrix: Major shipbuilding yards in China (COSCO, Zhoushan, Guangzhou), Japan, and the Philippines (Subic Bay).
- Estimated vessel CAPEX breakdown: Hull fabrication, slurry pumps, electrical power plant (3 × 1,500 kW marine diesel generators), Eriez LIMS drums, deck conveyors, and mooring winches.
- Conceptual Total Operating Cost (OPEX) modeling:
- Heavy fuel oil (HFO) / marine gas oil (MGO) consumption modeling under 24/7 continuous extraction cycles.
- Marine crew complements (officers, engineers, pump operators, deckhands).
- Preventative maintenance, spare parts (wear liners, pump impellers, conveyor belts), and classification drydocking provisions.
- Unit operating costs per metric metric ton of extracted ROM and upgraded rougher concentrate.
Technical specification
Mining barge
- Hull
- 130 m × 35 m non-self-propelled barge
- Depth (moulded)
- 9.5 m
- Operating draft
- 4.2–4.5 m
- Dredge pumps
- 2 × Kurimoto KSP-1500ESP, 1,100 kW each
- Separation
- 4 × Eriez wet drum LIMS, 950–1,150 Gauss
- Power
- 3 × 1,500 kW diesel generators
- Concentrate hold
- 800–1,000 t