Scope & Subject Matter

  • Capital expenditure benchmarking across construction alternatives:
  • Newbuild construction vs. existing hull conversion (Capesize/Handymax bulk carrier retrofits).
  • Shipyard evaluation and selection matrix: Major shipbuilding yards in China (COSCO, Zhoushan, Guangzhou), Japan, and the Philippines (Subic Bay).
  • Estimated vessel CAPEX breakdown: Hull fabrication, slurry pumps, electrical power plant (3 × 1,500 kW marine diesel generators), Eriez LIMS drums, deck conveyors, and mooring winches.
  • Conceptual Total Operating Cost (OPEX) modeling:
  • Heavy fuel oil (HFO) / marine gas oil (MGO) consumption modeling under 24/7 continuous extraction cycles.
  • Marine crew complements (officers, engineers, pump operators, deckhands).
  • Preventative maintenance, spare parts (wear liners, pump impellers, conveyor belts), and classification drydocking provisions.
  • Unit operating costs per metric metric ton of extracted ROM and upgraded rougher concentrate.
Technical specification

Mining barge

Hull
130 m × 35 m non-self-propelled barge
Depth (moulded)
9.5 m
Operating draft
4.2–4.5 m
Dredge pumps
2 × Kurimoto KSP-1500ESP, 1,100 kW each
Separation
4 × Eriez wet drum LIMS, 950–1,150 Gauss
Power
3 × 1,500 kW diesel generators
Concentrate hold
800–1,000 t