Volume IVCoastal Beneficiation & Magnetite Upgrading Facility
16. Beneficiation Flowsheet: Spiral Classification, Ball Mills & Multi-Stage Magnetic Cleaning
Pages 257–278 · 22 pages in this chapter278 / 530
Sources
Scope & Subject Matter
- Process design criteria: Design plant capacity of 1,000 TPD high-purity concentrate output (processing ~5,600 to 6,500 TPD rougher feed).
- Stage 1: Feed preparation, hydraulic classification, and spiral gravity separators to reject light silicate sands.
- Stage 2: Wet ball mill regrinding circuit to liberate locked magnetite grains to target particle size distribution (P80 passing 45 to 75 microns / -200 to -325 mesh).
- Stage 3: Three-stage wet low-intensity magnetic separation (LIMS):
- Primary Rougher LIMS: Intercepts ball mill discharge.
- Secondary Cleaner LIMS: Upgrades magnetic slurry to ≥58% Fe.
- Tertiary Finisher LIMS: Upgrades concentrate to final export specification of ≥62.0% to 65.5% Total Fe, with Low Titanium (TiO2 ≤ 4.5%) and ultra-low deleterious impurities (P ≤ 0.03%, S ≤ 0.04%).
- Stage 4: Concentrate dewatering via high-rate thickeners and ceramic/disc vacuum filtration to achieve <8.5% transport moisture limit (TML).
Technical specification
Upgrading plant
- Capacity
- 1,000 TPD finished concentrate
- Feed
- ~5,600 TPD
- Classification
- Spiral separators
- Regrind
- Ball mill, P80 45–75 µm
- Cleaning
- 3-stage LIMS to ≥62–65% Fe
- TiO₂
- ≤ 4.5%
- Water
- Zero-effluent closed loop
- CAPEX
- US$50–55M (Class 5)
Interactive · mass balance
Upgrading plant throughput calculator
Concentrate
1,002 TPD
Tailings
4,598 TPD
Export concentrate
702 TPD
Pellet plant feed
301 TPD
Annual: 330.8 kt concentrate · 231.6 kt export · 99.2 kt to pelletizing. Defaults reflect the 1,000 TPD design on ~5,600 TPD feed and the 70/30 split.