Volume IVCoastal Beneficiation & Magnetite Upgrading Facility

16. Beneficiation Flowsheet: Spiral Classification, Ball Mills & Multi-Stage Magnetic Cleaning

Pages 257–278 · 22 pages in this chapter278 / 530
Sources

Scope & Subject Matter

  • Process design criteria: Design plant capacity of 1,000 TPD high-purity concentrate output (processing ~5,600 to 6,500 TPD rougher feed).
  • Stage 1: Feed preparation, hydraulic classification, and spiral gravity separators to reject light silicate sands.
  • Stage 2: Wet ball mill regrinding circuit to liberate locked magnetite grains to target particle size distribution (P80 passing 45 to 75 microns / -200 to -325 mesh).
  • Stage 3: Three-stage wet low-intensity magnetic separation (LIMS):
  • Primary Rougher LIMS: Intercepts ball mill discharge.
  • Secondary Cleaner LIMS: Upgrades magnetic slurry to ≥58% Fe.
  • Tertiary Finisher LIMS: Upgrades concentrate to final export specification of ≥62.0% to 65.5% Total Fe, with Low Titanium (TiO2 ≤ 4.5%) and ultra-low deleterious impurities (P ≤ 0.03%, S ≤ 0.04%).
  • Stage 4: Concentrate dewatering via high-rate thickeners and ceramic/disc vacuum filtration to achieve <8.5% transport moisture limit (TML).
Technical specification

Upgrading plant

Capacity
1,000 TPD finished concentrate
Feed
~5,600 TPD
Classification
Spiral separators
Regrind
Ball mill, P80 45–75 µm
Cleaning
3-stage LIMS to ≥62–65% Fe
TiO₂
≤ 4.5%
Water
Zero-effluent closed loop
CAPEX
US$50–55M (Class 5)
Interactive · mass balance

Upgrading plant throughput calculator

Concentrate
1,002 TPD
Tailings
4,598 TPD
Export concentrate
702 TPD
Pellet plant feed
301 TPD

Annual: 330.8 kt concentrate · 231.6 kt export · 99.2 kt to pelletizing. Defaults reflect the 1,000 TPD design on ~5,600 TPD feed and the 70/30 split.